Renew   |   FAQ   |   Blog   |   Contact Us   |   Report Abuse   |   Sign In
ASPE central
Blog Home All Blogs
Search all posts for:   

 

View all (15) posts »
 

Missing Direction

Posted By Ken Horner, Wednesday, November 29, 2017
 

 

While bidding a job last week for a large movie theater that had only partial design on the fire alarm system, I noted on the architectural drawing that the design should be by the fire alarm contractor / EC. Nothing to reference this on the electrical drawings. I then called one of the general contractors, and he said to bid what was on the drawings.

 

I told him about the note.  The conclusion we both arrived at was to list it as an add to base bid for a code compliant system with a description of what was needed to make it a complaint system.

 

Would you have handled it differently ?

 

 

Ken Horner

Certification Committee

Tags:  certification 

Permalink | Comments (0)
 
Membership Management Software Powered by YourMembership  ::  Legal