Renew   |   FAQ   |   Blog   |   Contact Us   |   Report Abuse   |   Sign In
News & Press: General Information

Missing Direction

Wednesday, November 29, 2017   (0 Comments)
Posted by: Ken Horner
 

 

While bidding a job last week for a large movie theater that had only partial design on the fire alarm system, I noted on the architectural drawing that the design should be by the fire alarm contractor / EC. Nothing to reference this on the electrical drawings. I then called one of the general contractors, and he said to bid what was on the drawings.

 

I told him about the note.  The conclusion we both arrived at was to list it as an add to base bid for a code compliant system with a description of what was needed to make it a complaint system.

 

Would you have handled it differently ?

 

 

Ken Horner

Certification Committee


Membership Management Software Powered by YourMembership  ::  Legal